Current Location: Home >> Products >> Scissor Hydraulic Lift

3 Ton Low Profile Scissor Lilt

  • Model:QJYJ30-CB
  • Capacity:3 Ton

• Easy installation

• Four cylinder design, more smoothly

• Extendable platform design, wide range of services

• Mechanical locking device safe and reliable

• Pneumatic unlocked and low noise

• Design of High Strength structure to ensure security


Product Information | Product Parameters | Features | Common Problems And Solutions
Product Information

Space-saving design helps turn wasted floor space into a valuable service area. Lift raises speeding  in just under one minute.  Automatic safety locks secure lift at multiple service heights• An ergonomic control panel features simple push-button up and down controls and pneumatic safety release.  Item too large for lift gate.  Requires forklift on site for unloading. 

public-详情图片.jpg



Product Parameters

Model

QJYJ30-CB


Capacity

3 Ton

Min ground clearance

110mm


Max ground clearance

1850mm

Rise time

60 sec.


 Drop time

 45 sec.

Power of moter

2.2 kw


Power of supply

380V / 220V

Tabel  length

1475 mm


Tabel  width

662 mm

N.W./G.W.

910/925 kgs


1#Package size

2010x700x420 mm

2#Package size

1180x580x470 mm


QTY/20.CY

24 PCS

Features

• Easy installation

• Four cylinder design, more smoothly

• Extendable platform design, wide range of services

• Mechanical locking device safe and reliable

• Pneumatic unlocked and low noise

• Design of High Strength structure to ensure security


Common Problems And Solutions

Sequence of Lockout Procedure

1) Notify all affected employees that a lockout is being performed for servicing or maintenance and that the lift must be shut down and locked out to perform the servicing or maintenance

2) Unload the subject lift (remove vehicle). Shut it down and assure the disconnect switch is "OFF" if one is provided on the lift.

3) The authorized lockout person operates the main energy isolation device removing power to the lift being taken out of service. Stored or residual energy (such as capacitors, springs, elevated machine members, hydraulic systems, air, or etc.) must be dissipated or restrained by methods such as grounding, repositioning, blocking, bleeding down, etc.

If this is a lockable device, the authorized lockout person places the assigned padlock on the device to prevent its unintentional reactivation. An appropriate tag is applied stating the person's name, at least 3" x 6" in size, an easily noticeably color, and states not to operate device or remove tag. If this device is a non-lockable circuit breaker or fuse, replace circuit with a "dummy" device and tag it appropriately as mentioned above.

4) Ensure that the equipment is disconnected from the energy sources' by first checking that no personnel are exposed, then verify the isolation of the equipment by operating the push button or other normal operating controls' or by testing to make certain the equipment will not operate. . Be sure to return any switches to the "OFF" position.

5) The equipment is now locked out and ready for the required maintenance or service.


Restoring Equipment to Service

1) Check the lift and the immediate area around the lift to ensure that nonessential items have been removed

(clear all tools, vehicles and personnel) and that the completion of all lift components are operationally intact.

2) The authorized person can now remove the lock (or dummy circuit breaker or fuse) and tag. Activate the energy

isolating device so that the lift may again be placed into operation.

Our Phone

Hotline

400-066-4786

Feedback
Contact
Telephone
Fill in your message
Tongrun WeChat

ewm2.jpg

Follow The Dynamic

Company Address

江苏省常熟市经济技术开发区

新龙腾工业园